Project Location

East River Parkway and Arlington Street

Location Map

Project Manager

Tyler Pederson
Phone: (612) 230-6418
Email: tpederson@minneapolisparks.org

Subscribe to Email Updates

Language Resources

Status

Current Phase: Pre-Design

East River Parkway Slope Failure Update

The MPRB and the University of Minnesota have cooperatively completed a round of topological surveying along the river bank and bluff between the no. 9 bridge and East River Flats Park and a detailed scan of the slope failure site north of the Washington Avenue Bridge.

See All Project Activity

Project Milestones

Quarter 1 – 2020:

  • Complete survey scanning work and data collection
  • Preliminary parkway and trail layout and feasibility study

Quarter 2 – 2020:

  • Develop preferred stabilization method, and parkway and trail layout
  • Seek funding sources

Quarter 3/4 – 2020:

  • Schematic Design and Engineering
  • Seek funding sources
  • Slope survey and scan

Quarter 1 – 2021:

  • Final Design and Engineering
  • Seek funding sources

Quarter 2 – 2021:

  • Advertisement for bids
  • Bid award

Quarter 3/4 – 2021

  • Construction
  • Slope survey and scan

Quarter 1 – 2022

  • Project completion