East River Parkway Slope Failure Assessment and Stabilization A project to assess and stabilize the July 2019 soil displacement along East River Parkway near Arlington Street.

Project Location

East River Parkway and Arlington Street

Location Map

Project Manager

Tyler Pederson
Phone: (612) 230-6418
Email: tpederson@minneapolisparks.org

Subscribe to Email Updates

Language Resources

Key Documents

Status

Current Phase: Negotiations with agency stakeholders

MPRB and Partnering Agencies Preferred Concept for Re-Stabilizing East River Parkway, North of Washington Ave

The MPRB, University of Minnesota, City of Minneapolis, and Hennepin County have informally agreed on a solution to reconstruct and stabilize East River Parkway and the regional trail along the […]

East River Parkway Slope Failure Update

The MPRB and the University of Minnesota have cooperatively completed a round of topological surveying along the river bank and bluff between the no. 9 bridge and East River Flats […]

See All Project Updates

Project Milestones

As of Q2 – 2022:

  • Preferred stabilization method is established.

Quarter 3/4 – 2022:

  • Schematic Design and Engineering
  • Seek funding sources
  • Slope survey and scan

2022 – Present: 

  • Negotiations with agency stakeholders
  • Ongoing monitoring of slope

Subscribe to Email Updates

Enter your email to receive updates about meetings, events and more.

Upcoming Meetings

There are currently no meetings scheduled.

Park Board Announcements

There are no announcements at this time. Please check back soon.