Theodore Wirth Beach Playground Rehabilitation Due to safety issues caused by subsurface soil conditions the large 5-12 playground structure will need to be removed. As a part of this project the playground will be replaced with nature play and stand-alone features until additional community engagement is conducted to determine a final design

Project Location

3200 Glenwood Ave

Location Map

Project Manager

Chris DesRoches, Park Project and System Manager
Phone: 612-313-7717
Email: desrocj0@minneapolisparks.org

Subscribe to Email Updates

Language Resources

Status

Current Phase: Completed

Key Documents

Proposed Theodore Wirth Beach Playground 5-12 Designs [PDF]

New playground equipment coming soon to Wirth Beach!

Installation of the new equipment is scheduled to begin in late August and continue into the fall

Help design a new playground at Wirth Beach!

Playground equipment will be upgraded to meet current safety and accessibility standards

Playground rehabilitation begins soon at Wirth Beach

Playground closed due to safety issues caused by unstable soil conditions; equipment will be replaced by temporary nature play features

See All Project Activity

Project Milestones

April 2021

Removal of existing 5-12 playground structure

May 2021

Installation of nature play and stand alone playground features

Winter 2021/2022

Community Engagement – Design

Fall 2022

Construction

Subscribe to Email Updates

Enter your email to receive updates about meetings, events and more.

Upcoming Meetings

There are currently no meetings scheduled.

Project Type: Rehabilitation

Park Board Announcements

There are no announcements at this time. Please check back soon.