Lake Harriet Parkway Resurfacing Removal and replacement of deteriorated pavement around Lake Harriet.
Project Location
Minneapolis Chain of Lakes Regional Park
Location MapProject Manager
Daniel Elias
Phone: 612-230-6435
Email: delias@minneapolisparks.org
Subscribe to Email Updates
Language Resources
Correo Electrónico: preguntas@minneapolisparks.org
Email: suaalo@minneapolisparks.org
Key Documents
Status
Current Phase: Construction
Anticipated Construction Timeframe: Summer 2026 to Fall 2027
Road Closures: Yes
NPP20 Funded: No
What's New
There are currently no project updates. Please check back later.
Timeline
Milestones (anticipated project schedule by month/season)
Pedestrian Ramp Replacements – Summer 2026
Phase 1 Resurfacing – Fall 2026
Phase 2 Resurfacing – 2027
Get Involved
Subscribe to Email Updates
Enter your email to receive updates about meetings, events and more.
Upcoming Meetings
There are currently no meetings scheduled.
Background & Funding
History
The objective of this program is to remove deteriorated pavement and provide a new driving surface to further extend the life of the street in advance of a costlier reconstruction. Sealcoating the parkways extends the life of the roadway surface, while also providing the signature red aesthetic. This construction can extend the life of the existing parkway street by at least 10 years. Streets are evaluated for selection based on ride and condition of the roadway surface/section and the condition of the curb and gutter. The Parkway Paving Program was developed by the City Council and City Engineer, with significant coordination with the Minneapolis Park and Recreation Board, with the intent of maintaining the pavement condition across the parkway system.
Funding
The Minneapolis Parks and Recreation Board currently owns approximately 55 miles of parkways throughout Minneapolis. This system of parkways allows people to experience the City’s parks, lakes, gardens, and diverse neighborhoods. In order to maintain and improve the condition of parkway streets, Minneapolis Public Works assists with the maintenance of parkways by funding pavement improvements as a part of the Parkway Paving Program. This program consists of repaving parkway streets and may include replacement of some sections of curb, gutter, driveways, and pavement striping.